House renovation process

(1) Tools are in place and ready
Before decorating, remind you that you must prepare a few things in your bag: tape measure (buy 5m, not 3m), calculator, large clip (for receipts and receipts); in addition, it is best to be early At the construction site, prepare old towels (the kind of soft cotton, for wiping bricks after pasting), plastic bags (wrapped around the pipe joints to prevent clogging by dirt.
(2) Choose a good day and auspicious day, and start the fire before the workers enter the field.
It is best to measure the corners and corners of the house yourself, take a pen ruler to write down and mark them clearly, and be sure not to be lazy. The measurement content mainly includes: clarify the area involved in the decoration process. Especially tile area, wall paint area, wallpaper area, floor area; specify the main wall size. Especially in the future, it is necessary to design the wall size of the furniture.
(3) The main body is demolished and modified to make the space more practical
Demolition and modification of the main body is the first project, which mainly includes demolishing walls, laying walls, shoveling walls, dismantling heating, replacing plastic steel windows and so on. The garbage that has been demolished and modified should be cleaned out in time to ensure the cleanliness of the room, but also to facilitate construction. At this time, it is time to finalize the finished door. At this time, it is best to browse through the cabinets, hoods, stoves, and water heaters and determine them.
(4) Hydropower transformation, arrange the purpose of each space
Hydropower transformation, no regrets. The bricks are put on the wall and the ceiling is covered. It is difficult to add sockets. Therefore, we must determine the exact location of switches, lamps, basins, bathtubs, washing machines, etc. Before the hydropower transformation, the cabinet designer should come to the door for the first measurement to help you determine the power supply and waterway transformation plan. For water heaters, it is best to send someone to design the location of the power supply and interface according to the model you have determined.
Remind you: It is best to leave a power socket on the wall under the water basin for easy installation of kitchen treasures. Place the air-conditioning hole and power supply on the wall beside the bed as much as possible to avoid blowing the air-conditioning directly at people in the future. Strong currents and weak points should be kept at a distance of 20 cm. For example, a distance of 20 cm should be kept between sockets and network cables.
(5) Cover the riser pipe to wrap up the ugly pipe
Taking into account the damp and wet environment of the kitchen and bathroom, the material of the riser pipe must not be made of wood keel! Everyone must be careful, even if the wood keel is painted with anti-corrosion paint. Remember to use light steel keel or red brick for the riser pipe. Light steel keel saves places, but the most solid and easy to use is red brick.