Kitchen and bathroom ceiling details: 1. Installation sequence, first install the pipes and then do the ceiling: follow the correct aluminum gusset ceiling order to reduce vibration. The correct installation sequence in the bathroom is to install the bathroom heater and exhaust fan first, and then do the aluminum gusset Ceiling.

Never install the exhaust fan or Yuba directly on the aluminum gusset with screws, but can be directly hung on the top with expansion bolts; if the exhaust hose of the exhaust fan is relatively long (more than 1 meter), it is best to let workers fix it on the top Otherwise, the exhaust pipe will vibrate when the exhaust fan is turned on. In the kitchen aluminum gusset ceiling installation, you need to fix the hose of the range hood and the flue first, and select the location where the range hood needs to be installed at the other end, and then the aluminum gusset ceiling, it is best not to install large lamps directly on the ceiling .

2. Laying requirements, the gusset plate should be tight and seamless with the corners: when installing the keel, the direction of the keel should be determined according to the design direction of the aluminum gusset plate measurement construction drawing. After the determination, mark the keel distance line and the distance line on the roof. Punch points, punch holes with an electric hammer, and the depth of the holes should not exceed 4 cm to prevent damage to the embedded wires and tubes in the wall. After punching is ready, expand the matching inner expansion into the hole.

According to the height of the corners, saw the galvanized copper wire, put it in the inner expansion center, cut the keel according to the length of the room, and fix the keel on the copper wire with nuts. When laying aluminum gussets, you should also arrange the gussets and colors in order according to the measurement construction drawings. When laying the boards, the gussets should be tightly seamless with the corners, and the control line holes should be marked.

3. Inspection holes, artistically set inspection holes to facilitate maintenance: Many people generally do not set inspection holes in the kitchen and bathroom ceilings during home decoration, which affects the beauty. They do not know that once the pipeline equipment in the ceiling fails, they cannot check and determine what part and why , And it cannot be repaired. Therefore, it is better to set up manholes for the suspended ceiling of laying pipelines. You can choose the more concealed and easy-to-check parts and perform artistic treatment on the manholes, such as combining with lamps or decorations.

4. Pay attention to details and check to prevent deformation when purchasing accessories: When the kitchen and bathroom ceilings are purchased, the aluminum gusset plate and the matching keel and accessories should meet the product quality requirements, and be sure to check for bending and deformation. In the process of transportation and stacking, the gusset should be laid flat, not under pressure, and avoid high temperature and harmful substances.

The keel should be flat when installing, and the spacing deviation should be controlled within the allowable range. When installing the aluminum gusset, if there is a size deviation, it should be adjusted first and then inserted in order, not hard inserted to prevent deformation.

Precautions for kitchen and bathroom ceilings: 1. Pay attention to the “three preventions”. That is, waterproof, moisture-proof and fireproof. In the selection of materials, the use of wooden keels is not recommended. At present, aluminum gussets are commonly used in home improvement, which can basically overcome some of the defects of PVC boards, such as long time and easy discoloration and aging; easy to break; sticky greasy substances are difficult to clean.

2. Use aluminum-plastic panels with caution. In the process of installing aluminum-plastic panels, wood boards are used to support the bottom, so if you do not handle moisture well, the consequences will be disastrous. 3. Generally speaking, it is impossible for cabinets to be ceiling-mounted, which will free up a part of the space and affect the appearance, so it can be filled by ceiling. 4. The suspended ceiling also has the function of concealing wires, which is also convenient for cleaning in the kitchen.

Kitchen and bathroom ceiling methods: 1. Install pipes first and then do the ceiling: Install the aluminum gusset ceiling in the correct order to reduce vibration. The correct installation order in the bathroom is to install the bathroom heater and exhaust fan first, and then do the aluminum gusset ceiling. Never install the exhaust fan or Yuba directly on the aluminum gusset with screws. You can hang it directly on the top with expansion bolts;

if the exhaust hose of the exhaust fan is relatively long (more than 1 meter), it is best to let workers fix it on the top Otherwise, the exhaust pipe will vibrate when the exhaust fan is turned on. In the kitchen aluminum gusset ceiling installation, you need to fix the hose of the range hood and the flue first, and select the location where the range hood needs to be installed at the other end, and then the aluminum gusset ceiling, it is best not to install large lamps directly on the ceiling .

2. The gusset plate should be tightly seamless with the corners: when installing the keel, the direction of the keel should be determined according to the design direction of the aluminum gusset plate measurement construction drawing. After the determination, mark the keel distance line and the punching point on the roof , Electric hammer drilling, the drilling depth should not exceed 4 cm, in order to prevent damage to the embedded wires and tubes in the wall.

After punching is ready, expand the matching inner expansion into the hole. According to the height of the corners, saw the galvanized copper wire, put it in the inner expansion center, cut the keel according to the length of the room, and fix the keel on the copper wire with nuts. When laying aluminum gussets, you should also arrange the gussets and colors in order according to the measurement construction drawings. When laying the boards, the gussets should be tightly seamless with the corners, and the control line holes should be marked.

3. Artistic setting of manholes for easy maintenance: Many people generally do not set manholes on the kitchen and bathroom ceilings in home decoration, which affects the appearance. They don’t know that once the pipeline equipment in the ceiling fails, they cannot check and determine what part, what reason, and even more.

Repair, therefore, it is better to set up manholes on the ceiling for laying pipelines. You can choose places that are more concealed and easy to check, and perform artistic treatment on the manholes, such as combining with lamps or decorative objects.

Kitchen and bathroom ceiling conditions: 1. If the smoke pipe of the hood is in the ceiling, install the pipe in advance. 2. If the electric water heater is to be half-packed, install it in advance. 3. If the gas pipe of the gas water heater should go into the ceiling, install the gas water heater in advance.

4. When making water and electricity reforms in the early stage, there should be enough wires in the bathroom and kitchen. Check whether the smoke pipe is on the ceiling. If the pipe is on the ceiling, install the pipe 3-5 days after the tile is applied and then on the ceiling. Finally, install the hood and cabinet on the same day.