Overall cabinet design method

Overall cabinet design method
When the designer first visits the door, the first step is to fully communicate with the owner and the decorating team, because everyone and every family has different living habits and hobbies. Through adequate communication from the three parties, the owner has a preliminary idea of ​​the layout of his kitchen. The designer knows the main things that need to be placed, and the designer helps the owner to complete their vision with a professional level, and also corrects possible problems. Designers must reflect everyone’s living habits and hobbies, including left-handed habits, etc. Only by adequate communication can they carry out a reasonable layout and a reasonable positioning according to the situation of each family. Some owners need water treatment equipment at home, such as: water softener, it is best to ask the water treatment equipment manufacturer to come together to ensure that a suitable socket location is reserved! Some owners often make some modifications to the kitchen. First of all, they must follow the rationality of not damaging the original pipes (sewage, flue), and convenient maintenance, let alone destroy the original structure of the house, and need to obtain the approval of the property.

The starting point should be conducive to increase the actual utilization of the cabinet space and enhance the visibility. The design and installation of the whole cabinet are inseparable from the cooperation of the decoration team. For example, the laying position of wall and floor tiles, the height of the ceiling, the width of the door frame line, the position of the gas meter, the actual direction of the gas pipe, water pipe, and power line all require the cooperation and construction of the decoration team. When the kitchen foundation construction is completed, the owner should notify the designer to carry out the final retest. At the same time, the electrical appliances related to the configuration should be purchased in place and the designer should confirm.

Therefore, the three-party cooperation between the owner, the designer, and the decorating team is a very important link, so as to avoid the losses caused by the miscommunication of the three parties. After the designer’s final retest is completed. The owner should take the initiative to make an appointment to sign the contract (store). At this time, the designer and the owner need to further improve the details. From the style, style and color, item by item, the designer should be as thoughtful as possible in terms of professionalism. Be more detailed. For some things that are not clear to the owner, you must explain clearly one by one, including materials, materials, material origin, material performance, hardware accessories, production characteristics, actual installation conditions, cabinet structural features, etc. In terms of styles and colors, we should listen to the opinions of the owners more, and finally sign the contract and drawings, confirm on the drawings, and then enter the factory production process, installation process, sales process, and after-sales process.