Precautions for floor decoration

Choose to lay the floor on time
1. Choosing the time and environment for paving: The floor itself is made of natural wood, and the requirements for environmental temperature and humidity are relatively high. Generally, the temperature of laying the floor is more suitable between 16℃ and 30℃, which can keep the wood floor in the best natural condition. In terms of seasons, spring and autumn are more suitable than summer and winter. During the 24 hours a day, try to avoid construction at noon and night, and it is best to start construction after 2 pm.
2. Reasonable arrangement of decoration and construction: The process of floor paving should be carried out after all basic decoration construction is completed to avoid damage to the laid floor during other construction. Especially after painting, tiling and other constructions are completed, the construction site should be cleaned before laying. If the floor space needs to be painted with wall paint, you can also reserve the last painting when painting the wall. After the floor is finished, apply the final wall paint. After the wall paint is dry, Then finally install the floor anchor line.
Moisture-proof floors are prepared
1. Moisture-proof treatment of materials: Floor materials should be stored at room temperature for two days before paving. In order to better prevent moisture, the floor should be stored in a ventilated and dry place and protected with plastic film. Floors that are already damp are more prone to mold, and their service life will be greatly shortened, and they cannot be dried and reused. The purchased floor shall be treated with moisture before laying. Apply a layer of moisture-proof protective paint on the reverse side of the floor to prevent the dampness of the paved floor from affecting the floor, causing the floor to empty.
2. Ground treatment before paving: ensure that the ground and floor are clean before installation. If necessary, apply a thin layer of cement slurry before paving to remove stains on the floor, and then paving after the cement is dry. In order to ensure the moisture-proof effect, the ground must be water-proof and moisture-proof again, especially the space near the kitchen and bathroom.