1. Pre-design
Before the renovation of self-built houses in rural areas, pre-design must be carried out, such as design style, color matching, material matching, etc. These issues must be communicated with the designer first, and after obtaining a complete and satisfactory design plan, proceed to the second step. construction.
2. Main body dismantling
Entering the construction stage, the main body demolition and modification is the first project, which mainly includes demolition of walls, wall laying, shoveling of walls, demolition of heating, replacement of plastic steel windows and so on. To put it bluntly, the main body dismantling and reforming is to put up the frame of the construction site first.
3. Hydropower transformation
Before the water circuit transformation, the main structure dismantling and modification should be basically completed. Between the two links of hydropower transformation and main body demolition, some students may know that the first measurement of the cabinet should also be carried out. For the first measurement of the cabinet, students with a little experience can complete it by themselves. After the waterway renovation is completed, it is best to waterproof the bathroom immediately. Kitchens generally do not need to be waterproofed.
Fourth, the main ingredients enter the field
Some students have always thought that before the decoration starts, some main materials should go to the scene. What I want to say is, unless it is the main materials needed for the main body to be dismantled and modified, the entry time of the main materials such as ceramic tiles and large core boards should be after the hydropower transformation. This is because if the circuit transformation involves slotting on the ground, and if the tiles and large core boards are placed in an improper position, it will be troublesome for workers to move around.
Five, woodworker, bricklayer, oiler
Woodworkers, bricklayers and oilers are the “three brothers” in the construction process. The basic order of appearance is: wood-tile-oil. The basic principle of appearance is-whoever gets dirty will go first. “Whoever gets dirty first” is also one of the basic principles that determine the order of home improvement. In fact, carpentry work such as covering vertical pipes, making decorative ceilings, and plastering lines can also be considered as a detailed link of the main body’s dismantling and modification in a sense. It does not conflict with the water circuit modification, and sometimes it needs some Cooperate. The “oil worker’s eldest third” enters the venue, mainly to complete the basic wall treatment, painting the surface paint, and painting the furniture made by the “wood worker”.
2020-10-10