Tiling

Tile tiling skills: Construction skills for floor tiling: 1. If ceramic floor tiles are used for tiling, the ceramic floor tiles should be soaked in the shade first. 2. When tiling tiles, the cement mortar should be applied to the back of the ceramic floor tiles, and the rubber should be used to knock it firmly after paving. At the same time, check the correction with a spirit level, and wipe the surface cement mortar. 3. After the tiles are pasted for 2 to 3 hours, wipe the joints with white cement, and use cement and sand = 1:1 (volume ratio) cement mortar. The joints should be filled tightly and smoothly.

Wipe the surface clean with cotton thread. Construction skills for wall tile paste: 1. When treating the basic level, all kinds of dirt on the wall should be cleaned up and watered and moistened one day in advance. For example, when the base layer is a new wall, when the cement mortar is 70% dry, bricks should be arranged, threaded, and bricks pasted. 2. The standard points must be pasted before the formal pasting to control the flatness of the pasted surface. The flatness should be checked with a ruler at any time during operation. If it is not flat or straight, remove and re-stick.

3. Before the tile is pasted, it must be soaked in clean water for more than two hours. Take out the tile and dry it for later use. When pasting, paste from bottom to top. The mortar is required to be full. When the ash is lost, it must be removed and re-adhesive. It is not allowed to fill the joints and mouths of the bricks.

4. When paving and sticking, when encountering pipelines, lighting switches, bathroom equipment supporting parts, etc., they must be cut and matched with whole bricks, and it is prohibited to use non-whole bricks to paste together. Pasting of the whole or independent parts should be done at one time, if it cannot be done at one time, the stubble opening should be left in the construction joint or the internal corner.

Precautions for tiling: 1. Precautions for laying wall tiles: 1. When treating the basic level, all kinds of dirt on the wall should be cleaned up and watered and moistened one day in advance. For example, when the base layer is a new wall, when the cement mortar is 70% dry, the bricks should be arranged, stringed, and wall tiles should be glued. 2. Before the tile is pasted, it must be soaked in clean water for more than 2 hours. Take out the tile and dry it for later use.

3. When paving and sticking, when encountering pipelines, lighting switches, and supporting parts of bathroom equipment, they must be cut and fitted with whole bricks, and it is prohibited to use non-whole bricks to paste together. 2. Precautions for the laying of floor tiles: 1. The tiles should be soaked in water for half a day before use, subject to the bricks not bubbling. 2. The kitchen and bathroom should have a slope of flowing water, no water accumulation or backflow.

If the original waterproof layer is damaged during the construction, it must be treated with waterproofing, and there is no leakage in the 12-hour test of the standing water. 3. After the floor tiles are laid, cover the brick surface with cardboard, etc., and walk on the brick surface at least 24 hours later.