Waterproof leakage method

Nowadays, problems with the quality of housing projects appear more and more frequently, and people are most concerned about the problem of waterproofing and repairing the leakage of housing. The waterproofing and repairing of housing is also a big process, because the current construction market is mixed, so this often occurs. For such process disputes, at this time, a systematic and formal waterproofing repair contract must be formulated before construction, so as to avoid disputes to the greatest extent.
1. The floor of the bathroom should be leveled first, for users who are newly decorated or renovated. If you want to replace the floor tiles in the bathroom. After chiseling out the original floor tiles, you must first level the ground with cement mortar, and then do waterproof treatment. This can prevent leakage of the waterproof paint due to uneven thickness.
Second, the joints should be painted in place. The joints between the bathroom wall and the ground and the joints between the water pipes and the ground are the most prone to problems. You are under construction. The decoration workers must be urged to handle these corners and corners, and all waterproof coatings must be applied “in place”.
Third, the wall treatment is also very important. In the general bathroom waterproof treatment, about 30 cm high waterproof coating should also be used on the wall to prevent the accumulation of water from bleeding through the wall. However, if the wall of the bathroom is a non-load-bearing light wall, the entire wall must be covered with waterproof coating. If you use a two-leaf shower screen in your home, the two connected walls should also be painted. If your home uses a bathtub, the wall adjacent to the bathtub. The height of the waterproof coating is also higher than the upper edge of the bathtub.
Fourth, the waterproof experiment is indispensable. After the toilet construction is completed, all the water in the toilet is blocked, and a 25 cm high “ridge” is built at the door, and then 20 cm high water is poured into the bathroom. After 24 hours, check the surrounding walls and ground for leakage. This kind of 24-hour waterproof test is the key to ensuring the quality of the bathroom waterproofing project. You must do it.