Wooden door installation details
Wooden door installation details: 1. Please place the goods horizontally on the ground to be loaded, do not lean against it. 2. Unpainted products should be painted within five days. 3. Try to avoid prolonged exposure to outdoor sunlight to prevent the wooden door from heating. 4. Keep indoor air circulation to prevent the wooden door from getting damp frequently.
Precautions for wooden door installation: 1. Please place the goods horizontally on the ground when loading, and do not lean against it. 2. Unpainted products should be painted within five days. 3. Try to avoid prolonged exposure to outdoor sunlight to prevent the wooden door from heating. 4. Keep indoor air circulation to prevent the wooden door from getting damp frequently. 5. Prevent the wooden door from being impacted abnormally. Do not use excessive force when it is not closed. 6. It is strictly forbidden to nail heavy objects on the door.
7. Before installing the corner wall and T-shaped wall door opening, the customer should be notified to make a “fake wall” on the side without the door stack, with a width of not less than 50mm, and determine the width of the “fake wall” according to the width of the line. Otherwise, the door edges shown on both sides are asymmetrical. 8. The reserved size of the door opening for single-leaf side-hinged doors, double-leaf side doors and double-leaf side doors is (the thickness of the cover is 32mm): door opening height = door leaf height + 40mm, door opening width = door leaf width + 65mm. Other types of combination doors are determined according to the specific situation (note: the height of the door opening refers to the net height of the ground engineering from the completed opening, the width and thickness of the door opening are also the net dimensions).
Wooden door installation method: 1. Assemble the door cover: first find out the door cover and the vertical plate, and align the joints according to the number on the back. The cuts should be on the same plane, and glue on the joints. 2. Install the door cover: Put the firmly assembled door cover into the door hole as a whole, and use small wooden strips to roughly fix the door cover around. The two sides of the door cover should be on the same plane as the wall, and then check whether the door cover is perpendicular to the ground.
Whether the two corners of the top plate of the door cover and the two vertical plates are right angles, and whether the vertical plate of the door cover is bent, twist the two ends of the iron sheet to wrap the wall. 3. Install the door leaf: open the hinge groove first, and the distance between the hinge groove and the two ends of the door leaf should be 1/10 of the height of the door leaf.
Wooden door installation conditions: (1) The wooden door must be installed with a reserved opening, and it is strictly forbidden to install and build the opening. (2) The wooden door must be installed after the installation of the hole ground engineering (such as: floor tiles, stone), and at the same time, after the wall putty is scraped and polished (the wall must be pasted with wall tiles, the openings of the stone must be all aligned with the openings) Side) before installation.
(3) The humidity of the wall of the installation hole is <25%. If the humidity is >25%, a moisture-proof isolation layer should be made on the installation wall. (4) The installation site environment is clean and tidy, free from clutter and cross-working.